Difference between revisions of "May 18"

From SVR Wiki
Jump to: navigation, search
(move to correct date)
(Info added)
Line 12: Line 12:
 
*1997 The SVR's second ever 'Heavy Horse' event took place, including horse drawn shunting demonstrations at Highley.<ref>SVR News 124</ref>
 
*1997 The SVR's second ever 'Heavy Horse' event took place, including horse drawn shunting demonstrations at Highley.<ref>SVR News 124</ref>
 
*2004 [[Bridgnorth Station Footbridge]] re-opened after being dismantled for painting.
 
*2004 [[Bridgnorth Station Footbridge]] re-opened after being dismantled for painting.
 +
*2020 Phase 2 of [[Falling Sands Viaduct]] works commenced, to replace damaged bricks and repoint the mortar on the outside walls and arches.
  
 
==See also==
 
==See also==

Revision as of 20:08, 21 May 2020

On May 18 in SVRSevern Valley Railway history.

See also

On this day in SVRSevern Valley Railway history

← May 17 - May 19 →

References

  1. SVRSevern Valley Railway News 28
  2. 2.0 2.1 2.2 SVRSevern Valley Railway News 32
  3. SVRSevern Valley Railway News 68
  4. SVRSevern Valley Railway News 111
  5. SVRSevern Valley Railway News 124