SR 34053 Sir Keith Park

Revision as of 20:55, 23 August 2017 by Patrick Hearn (talk | contribs) (SKP to leave the SVR)
SR 34053 Sir Keith Park
34053 SKP Highley 2016.JPG
34053 at Highley in 2016
Built By SR Brighton Works
Configuration 4-6-2
BR rating 7P6F
Status In Service
Loco Number 34053
Other Numbers SR 21C153
History
Built 1947
Designed By Oliver Bulleid
Type SR Battle Of Britain Class
1966 Withdrawn by BR
1984 Left Barry
2012 Entered service on SVR
Technical
Length 67ft 4¾"
Weight 86t
Tractive effort 27,720 lb
Pressure 250 lb/sq in

Steam Locomotives

The SR 'West Country' and 'Battle of Britain' classes were designed by Oliver Bulleid, the CME of the Southern Railway (SR). Lighter than their sister locomotives, the Merchant Navy class, they could be used on a wider variety of routes including in the south-west of England and the Kent coast. They were a mixed-traffic design, being used for both passenger and freight trains, and were rated 7P6F by British Railways.

Originally built with innovative features including air-smoothed casings and chain-driven valve gear, many of the locomotives including 34053 were rebuilt by British Railways in the late 1950s.

Contents

34053 Sir Keith Park in service

34053 was built in 1946 at the SR’s Brighton Works and entered service as SR no 21C153. It was originally allocated to Salisbury MPD but also worked from the Stewarts Lane depot, where it hauled prestige services such as the Golden Arrow on many occasions. In 1960 it was transferred to Bournemouth, where it often hauled the Pines Express on the Somerset & Dorset Railway.

34053 was withdrawn from service by BR in October 1966 and towed to Woodham's scrapyard at Barry the following March.

34053 in preservation

34053's slide bars

34053 left Barry in 1984. Evidence of her time spent there can still be seen today in the form of the words "Sold Mr Woodham" which are visible on the lower left slide bar. After various owners and lengthy periods in store, restoration was finally completed by Southern Locomotives Limited (SLL) in May 2012. Having no need of the locomotive at Swanage, agreement was reached for 34053 to come to the SVR, with the agreement carrying a break clause every two years. The locomotive arrived at Bridgnorth on 10 May and after some 'fine tuning', entered service in August 2012. In August 2017 the SVR announced it had mutually agreed with SLL that the option to renew would not be actioned at the end of 2017, with 34053 moving to the Swanage Railway for the rest of the locomotive's certificate.[1]

See also

References

Links