Difference between revisions of "May 18"

From SVR Wiki
Jump to: navigation, search
(Info added)
Line 7: Line 7:
 
*[[Severn_Valley_Railway_Timeline_1980-1989 | 1983]] The line reopened following a closure caused by an embankment collapse south of [[Bridgnorth Bypass Bridge]] on April 30th.<ref>SVR News 68</ref>
 
*[[Severn_Valley_Railway_Timeline_1980-1989 | 1983]] The line reopened following a closure caused by an embankment collapse south of [[Bridgnorth Bypass Bridge]] on April 30th.<ref>SVR News 68</ref>
 
*1994 An inquest was held into the fatal accident at [[Waterworks Crossing]] in January. A verdict of accidental death was recorded, with no blame attached to the SVR.<ref>SVR News 111</ref>
 
*1994 An inquest was held into the fatal accident at [[Waterworks Crossing]] in January. A verdict of accidental death was recorded, with no blame attached to the SVR.<ref>SVR News 111</ref>
 +
*1996 [[GWR Mogul 7325]] commenced two weekends of London Underground 'Steam on the Met' services
 
*1997 The SVR's second ever 'Heavy Horse' event took place, including horse drawn shunting demonstrations at Highley.<ref>SVR News 124</ref>
 
*1997 The SVR's second ever 'Heavy Horse' event took place, including horse drawn shunting demonstrations at Highley.<ref>SVR News 124</ref>
 
*2004 [[Bridgnorth Station Footbridge]] re-opened after being dismantled for painting.
 
*2004 [[Bridgnorth Station Footbridge]] re-opened after being dismantled for painting.

Revision as of 04:09, 25 May 2019

On May 18 in SVRSevern Valley Railway history.

See also

On this day in SVRSevern Valley Railway history

← May 17 - May 19 →

References

  1. SVRSevern Valley Railway News 28
  2. 2.0 2.1 2.2 SVRSevern Valley Railway News 32
  3. SVRSevern Valley Railway News 68
  4. SVRSevern Valley Railway News 111
  5. SVRSevern Valley Railway News 124