March 19
From SVR Wiki
On March 19 in SVRSevern Valley Railway history.
- 1972 The telegraph pole route between Bridgnorth and Hampton Loade was completed with the erection of the final pole near Sterns[1].
Gallery
Pictures taken on 19 March:
2016: Signwriting in Bewdley yard
2016: GWR 41277 4 plank Open Goods Wagon at Bewdley
See also
On this day in SVRSevern Valley Railway history
References
- ↑ SVRSevern Valley Railway News 24