Difference between revisions of "November 27"

From SVR Wiki
Jump to: navigation, search
m
m (Link added)
Line 2: Line 2:
  
 
*1893 The GWR approved the provision of railings along the coping of the walls of [[Sandbourne Viaduct]].<ref>[[Bibliography#Books|Marshall (1989)]] p. 91.</ref>
 
*1893 The GWR approved the provision of railings along the coping of the walls of [[Sandbourne Viaduct]].<ref>[[Bibliography#Books|Marshall (1989)]] p. 91.</ref>
*1983 In preparation for track relaying at [[Eardington]], the track was slued so light engine movements during the Santa services could pass via the siding<ref>SVR News 71</ref>.
+
*1983 In preparation for track relaying at [[Eardington]], the track was slewed so light engine movements during the [Christmas services|Santa Special services]] could pass via the siding<ref>SVR News 71</ref>.
 
   
 
   
 
==See also==
 
==See also==

Revision as of 16:51, 28 June 2019

On November 27 in SVRSevern Valley Railway history.

  • 1893 The GWRGreat Western Railway approved the provision of railings along the coping of the walls of Sandbourne Viaduct.[1]
  • 1983 In preparation for track relaying at Eardington, the track was slewed so light engine movements during the [Christmas services|Santa Special services]] could pass via the siding[2].

See also

On this day in SVRSevern Valley Railway history

← November 26 - November 28 →

References

  1. Marshall (1989) p. 91.
  2. SVRSevern Valley Railway News 71