Kidderminster Signal Box

A signal box at Kidderminster, working to Bewdley South. The box also communicates with Network Rail's West Midlands Signalling Centre (WMSC) at Saltley.

Kidderminster Town had no signal box when it opened in 1984, resulting in an 'only one engine in steam' restriction on operations which were controlled by a simple ground frame. The signal box was built during between July and December 1986, the design being based on a typical GWR medium-sized box. Extensive measurements of Abbey Foregate and Sutton Bridge Junction signal boxes at Shrewsbury ensure authenticity. Installation of the signalling equipment took place throughout 1987. The installation work involved an estimated 8,000 man hours. producing a fully assembled 62 lever frame complete with all mechanical locking, fitting to the frame of 35 electric locks and 5 combined locks and circuit controllers, and installation of a 22 ft long block shelf complete with instruments. The box was commissioned in December of that year following installation of the most vital piece of equipment, the signalman’s leather armchair.

Until 2012 Kidderminster Station Signal Box worked to Kidderminster Junction signal box, 'over the fence' and operated by BR, RailTrack and finally Network Rail. The connection between the SVR and national rail was somewhat limiting, requiring staff on the track for any movement between railways. This all changed when Kidderminster Junction signal box closed in 2012 and extensive work by Network Rail and SVR S&T technicians installed one of the most comprehensive connections between the national rail network and a private heritage railway in existence, with movements from the SVR onto the Down Main and movements from the Up & Down Mains onto Network Rail being completely locked and signalled movements overseen by the cooperative efforts of the SVR signalman and NR signaller at Saltley. This upgrade also saw the first non-GWR/BR(W) signal installed on the SVR, in the form of a colour light signal reading from the SVR's 'exchange' line onto the national network or into the SVR's North Star Carriage & Wagon Works.

During the morning of Saturday 3 March 2013, the signal box suffered a small fire in the roof at the point where the stove flue passes through the ceiling. The signalman was able to leave the box without injury. A small section of the roof was destroyed, and there was some damage to the telephone system and the domestic wiring caused by the water used by the Fire Brigade, although the signalling equipment was largely unaffected. Kiddermister station was initially closed. Once access to the box was regained, the water was mopped up to prevent it falling into the frame room and its electrics. By 4pm the debris had been cleared and the roof made weather-proof with a plastic sheet supplied by Bewdley C&W Department. Rapid work by the S&T and PW departments then saw normal service resumed by commencement of operations on the following day.

Signalling diagram

Kidderminster box diagram.gif

See Also

SVR Wiki

Main Page

From SVR Wiki
Jump to: navigation, search

Welcome to the Severn Valley Railway Wiki

From this week's featured article
Eardington is situated on Eardington Bank, mid-way between Bridgnorth and Hampton Loade. In recent years, rebuilding the platform was completed in 2019 and the water tower was dismantled in 2021. Although the station no longer features in daily operations, it resumed use during gala events in 2023 more than 40 years since regular timetabled trains ceased. (Full article...)
Schematic Map of the SVRSevern Valley Railway
BridgnorthEardingtonHampton LoadeCountry Park HaltHighleyThe Engine HouseArleyVictoria BridgeNorthwood HaltWyre Forest LineBewdleyStourport BranchBewdley TunnelConnection to Network RailKidderminsterMaps#Schematic maps of the pre-closure SVRMapandlinks3.png
Click on the map for a
larger interactive version

For 101 years between 1862 and 1963, the Severn Valley Railway formed part of the national railway network, running for 40 miles between Hartlebury and Shrewsbury. Established as a separate company, it was mainly operated by the Great Western Railway (GWRGreat Western Railway) and later by British Railways (BRBritish Rail or British Railways).

The present day Severn Valley Railway (SVRSevern Valley Railway) was established in 1965 to preserve part of the line as a heritage railway. Today it has six stations and two halts and runs for 16 miles along the Severn Valley between Bridgnorth in Shropshire and Kidderminster in Worcestershire, following the course of the River Severn for much of its route. Operations involve a mixture of steam and heritage diesel-hauled services.

This unofficial website is a project aimed to collect information and record events relating to the SVRSevern Valley Railway, both past and present.

For timetables, fare information, and news about special events, please visit the SVR Official Website. Other news and information of interest to members, shareholders and enthusiasts can be found on SVRLive.

In April 2023 the SVRSevern Valley Railway announced the launch of a Survival Fund to enable it to overcome the current financial crisis and implement longer-term plans for its future. Information and details of how to donate may be found on the SVRSevern Valley Railway's Survival Fund page.

Categories of article

History of the Severn Valley Railway

Current events on the SVRSevern Valley Railway

Information about the SVRSevern Valley Railway

Miscellaneous


Query Corner

Unsurprisingly, there are a large number of questions about the SVRSevern Valley Railway, both in pre-preservation days and for a number of historical items since then. Take a visit down to Query Corner to see if you have a recollection relating to some long forgotten event, or know of a reliable source (maybe an early edition of the SVR News?) that might have the information we need!

In addition are a number of stub articles requiring further input.

Adding to this Wiki

This site, or "wiki", is a collaborative effort, and anyone who has any knowledge relating to the SVRSevern Valley Railway should feel free to contribute. Once you have created a user account and logged in, you can modify any page by clicking the "Edit" button in the top right hand corner. For some tips on how to format pages, and some guidelines on how to make this wiki accessible can be found on Tips for contributing to the SVR Wiki.

Alternatively, if you don't feel confident editing this Wiki (although there is no reason you shouldn't!!), each article also has a "Discussion" page, which can be accessed by clicking the relevant button in the top left hand corner. This allows you to make additions, suggestions, or corrections to a page without making any change to the article itself.


Navigation menu