Difference between revisions of "June 5"
From SVR Wiki
(Created page with "On {{PAGENAME}} in SVR history. *1878 The GWR board was informed that a pit was to be su...") |
(No difference)
|
Revision as of 16:31, 4 July 2017
On June 5 in SVRSevern Valley Railway history.
- 1878 The GWRGreat Western Railway board was informed that a pit was to be sunk at Billingsley Colliery, with a proposed connection to the Railway near Borle Viaduct.
See also
On this day in SVRSevern Valley Railway history