April 9

From SVR Wiki
Revision as of 15:52, 8 September 2017 by Robin (talk | contribs) (Created page with "thumb|300px|right|The engine and generator of 50007 Hercules on 9 April 2017On {{PAGENAME}} in SVR history. *Severn Valley Railway Timeli...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
The engine and generator of 50007 Hercules on 9 April 2017
On April 9 in SVRSevern Valley Railway history.
  • 1971 BR Standard Class 7 70000 Britannia arrived on the SVRSevern Valley Railway for restoration.
  • 1994 The line reopened following temporary repairs to Hay Bridge, damaged by a lorry strike three days earlier.
  • 2017 Visitors to the Diesel Depot during the 'Open House' weekend could inspect the engine and generator of 50007 Hercules which were awaiting re-installation following repairs.

See also

On this day in SVRSevern Valley Railway history

← April 8 - April 10 →