*1892 The GWR Engineering Committee authorised construction of a footbridge north of [[Wribbenhall Viaduct]] connecting Northwood Lane to Summer Hill. This was removed in the 1930s.<ref>[[Bibliography#Books|Marshall (1989)]] p. 94.</ref>
*1964 The signal box at [[Buildwas]] was taken out of use by BR.<ref>[[Bibliography#Books|Mitchell and Smith (2007)]] fig. 96.</ref>
*[[Severn Valley Railway Timeline 1970-1979#1972|1972]] [[Severn Valley Railway (Holdings) PLC|SVR(H)]] was incorporated under its original name of Severn Valley Railway (Holdings) Limited.<ref name=CH>[https://beta.companieshouse.gov.uk/company/01046274 Companies houseHouse]</ref>
*[[Severn Valley Railway Timeline 1980-1989#1982|1982]] [[Severn Valley Railway (Holdings) PLC|SVR(H)]] was re-registered as a public limited company (PLC)<ref name=CH/>.