Changes

Jump to: navigation, search

March 15

384 bytes added, 16:26, 15 March 2018
no edit summary
On {{PAGENAME}} in SVR history.
*1892 The GWR Engineering Committee authorised construction of a footbridge north of [[Wribbenhall Viaduct]] connecting Northwood Lane to Summer Hill. This was removed in the 1930s.<ref>[[Bibliography#Books|Marshall (1989)]] p. 94.</ref>*1964 The signal box at [[Buildwas]] was taken out of use by BR.<ref>[[Bibliography#Books|Mitchell and Smith (2007)]] fig. 96.</ref>*[[Severn Valley Railway Timeline 1970-1979#1972|1972]] [[Severn Valley Railway (Holdings) PLC|SVR(H)]] was incorporated under its original name of Severn Valley Railway (Holdings) Limited.<ref name=CH>Companies house</ref>*[[Severn Valley Railway Timeline 1980-1989#1982|1982]] [[Severn Valley Railway (Holdings) PLC|SVR(H)]] was re-registered as a public limited company (PLC)<ref name=CH/>.
==Gallery==
{{On this day see also}}
==References==
<references />
[[Category:On this day in March]]
Trustworthy, administrator
11,886
edits

Navigation menu