Difference between revisions of "September 5"

From SVR Wiki
Jump to: navigation, search
(add photo)
Line 2: Line 2:
 
On {{PAGENAME}} in SVR history.
 
On {{PAGENAME}} in SVR history.
  
*[[Severn Valley Railway Timeline 2000-2009#2006|2006]] With construction complete, the keys for the new refreshment room in the [[Kidderminster#Concourse|Kidderminster concourse]] were formally handed over to the SVR.  
+
*[[Severn Valley Railway Timeline 2000-2009#2006|2006]] With construction complete, the keys for the new refreshment room in the [[Kidderminster#Concourse|Kidderminster concourse]] were formally handed over to the SVR<ref>SVR News 154</ref>.  
  
 
==See also==
 
==See also==
  
 
{{On this day see also}}
 
{{On this day see also}}
 +
==References==
 +
<references />
  
 
[[Category:On this day in September|September 05]]
 
[[Category:On this day in September|September 05]]

Revision as of 13:32, 3 September 2018

Kidderminster concourse

On September 5 in SVRSevern Valley Railway history.

  • 2006 With construction complete, the keys for the new refreshment room in the Kidderminster concourse were formally handed over to the SVRSevern Valley Railway[1].

See also

On this day in SVRSevern Valley Railway history

← September 4 - September 6 →

References

  1. SVRSevern Valley Railway News 154