Difference between revisions of "September 5"
From SVR Wiki
(add photo) |
|||
Line 2: | Line 2: | ||
On {{PAGENAME}} in SVR history. | On {{PAGENAME}} in SVR history. | ||
− | *[[Severn Valley Railway Timeline 2000-2009#2006|2006]] With construction complete, the keys for the new refreshment room in the [[Kidderminster#Concourse|Kidderminster concourse]] were formally handed over to the SVR. | + | *[[Severn Valley Railway Timeline 2000-2009#2006|2006]] With construction complete, the keys for the new refreshment room in the [[Kidderminster#Concourse|Kidderminster concourse]] were formally handed over to the SVR<ref>SVR News 154</ref>. |
==See also== | ==See also== | ||
{{On this day see also}} | {{On this day see also}} | ||
+ | ==References== | ||
+ | <references /> | ||
[[Category:On this day in September|September 05]] | [[Category:On this day in September|September 05]] |
Revision as of 13:32, 3 September 2018
On September 5 in SVRSevern Valley Railway history.
- 2006 With construction complete, the keys for the new refreshment room in the Kidderminster concourse were formally handed over to the SVRSevern Valley Railway[1].
See also
On this day in SVRSevern Valley Railway history
References
- ↑ SVRSevern Valley Railway News 154