Difference between revisions of "September 28"
From SVR Wiki
(Created page with "On {{PAGENAME}} in SVR history. * 2009 The tender of LMS 43106 was derailed at Hampton Loade. There were no i...") |
|||
Line 1: | Line 1: | ||
On {{PAGENAME}} in SVR history. | On {{PAGENAME}} in SVR history. | ||
− | *[[Severn Valley Railway Timeline 2000-2009#2009 | 2009]] The tender of [[43106|LMS 43106]] was derailed at [[Hampton Loade]]. There were no injuries to passengers. | + | *1985 Phase 2 of [[Kidderminster| Kidderminster station]], the main entrance, opened to the public for the first time.<ref>SVR News 78</ref> |
+ | *[[Severn Valley Railway Timeline 2000-2009#2009 | 2009]] The tender of [[43106|LMS 43106]] was derailed at [[Hampton Loade]]. There were no injuries to passengers<ref>SVR News 168</ref>. | ||
==See also== | ==See also== | ||
{{On this day see also}} | {{On this day see also}} | ||
+ | ==References== | ||
+ | <references /> | ||
[[Category:On this day in September]] | [[Category:On this day in September]] |
Revision as of 20:14, 1 October 2018
On September 28 in SVRSevern Valley Railway history.
- 1985 Phase 2 of Kidderminster station, the main entrance, opened to the public for the first time.[1]
- 2009 The tender of LMS 43106 was derailed at Hampton Loade. There were no injuries to passengers[2].
See also
On this day in SVRSevern Valley Railway history
← September 27 - September 29 →