Difference between revisions of "May 31"
From SVR Wiki
(Created page with "On {{PAGENAME}} in SVR history. *1905 The GWR authorised the construction of 'further cattle accommodation' at Bridgnorth. ==See also== {{On this day see also}} Cat...") |
|||
Line 1: | Line 1: | ||
On {{PAGENAME}} in SVR history. | On {{PAGENAME}} in SVR history. | ||
− | *1905 The GWR authorised the construction of 'further cattle accommodation' at [[Bridgnorth]]. | + | *1905 The GWR authorised the construction of 'further cattle accommodation' at [[Bridgnorth]].<ref>[[Bibliography#Books|Marshall (1989)]] p. 107.</ref> |
− | + | *1979 A Portakabin was delivered to Bridgnorth for use as a "temporary" buffet / restaurant facility.<ref>SVR News 52</ref> It is still in use in 2018. | |
+ | |||
==See also== | ==See also== | ||
{{On this day see also}} | {{On this day see also}} | ||
+ | ==References== | ||
+ | <references /> | ||
[[Category:On this day in May]] | [[Category:On this day in May]] |
Revision as of 16:15, 21 May 2018
On May 31 in SVRSevern Valley Railway history.
- 1905 The GWRGreat Western Railway authorised the construction of 'further cattle accommodation' at Bridgnorth.[1]
- 1979 A Portakabin was delivered to Bridgnorth for use as a "temporary" buffet / restaurant facility.[2] It is still in use in 2018.
See also
On this day in SVRSevern Valley Railway history
References
- ↑ Marshall (1989) p. 107.
- ↑ SVRSevern Valley Railway News 52