Difference between revisions of "May 31"

From SVR Wiki
Jump to: navigation, search
(Created page with "On {{PAGENAME}} in SVR history. *1905 The GWR authorised the construction of 'further cattle accommodation' at Bridgnorth. ==See also== {{On this day see also}} Cat...")
 
Line 1: Line 1:
 
On {{PAGENAME}} in SVR history.
 
On {{PAGENAME}} in SVR history.
  
*1905 The GWR authorised the construction of 'further cattle accommodation' at [[Bridgnorth]].
+
*1905 The GWR authorised the construction of 'further cattle accommodation' at [[Bridgnorth]].<ref>[[Bibliography#Books|Marshall (1989)]] p. 107.</ref>
+
*1979 A Portakabin was delivered to Bridgnorth for use as a "temporary" buffet / restaurant facility.<ref>SVR News 52</ref> It is still in use in 2018.
 +
 
 
==See also==
 
==See also==
  
 
{{On this day see also}}
 
{{On this day see also}}
 +
==References==
 +
<references />
  
 
[[Category:On this day in May]]
 
[[Category:On this day in May]]

Revision as of 16:15, 21 May 2018

On May 31 in SVRSevern Valley Railway history.

  • 1905 The GWRGreat Western Railway authorised the construction of 'further cattle accommodation' at Bridgnorth.[1]
  • 1979 A Portakabin was delivered to Bridgnorth for use as a "temporary" buffet / restaurant facility.[2] It is still in use in 2018.

See also

On this day in SVRSevern Valley Railway history

← May 30 - June 1 →

References

  1. Marshall (1989) p. 107.
  2. SVRSevern Valley Railway News 52