Difference between revisions of "June 26"
From SVR Wiki
(Link edited) |
|||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
On {{PAGENAME}} in SVR history. | On {{PAGENAME}} in SVR history. | ||
− | *1861 With construction of the Severn Valley Railway still in progress, a Special General Meeting of the Severn Valley Railway Co. was held to approve the application for a Bill to construct the [[Kidderminster Loop]] (this early proposal never came to fruition and the Loop was eventually completed by the GWR in 1878).<ref>[[Bibliography#Books|Nabarro (1971)]] p. 51.</ref> | + | *1861 With construction of the Severn Valley Railway still in progress, a Special General Meeting of the Severn Valley Railway Co. was held to approve the application for a Bill to construct the [[Kidderminster Loop Line]] (this early proposal never came to fruition and the Loop was eventually completed by the GWR in 1878).<ref>[[Bibliography#Books|Nabarro (1971)]] p. 51.</ref> |
+ | *1975 [[DRG 64 305]] commenced its journey to the SVR from Stolberg, West Germany, where the locomotive had been in store since purchase the previous year. | ||
*1999 A two-day working party was organise to re-rope the [[Cowans Sheldon 30-ton steam crane RS 1087|30-ton Steam Crane]]<ref>SVR News 130</ref>. | *1999 A two-day working party was organise to re-rope the [[Cowans Sheldon 30-ton steam crane RS 1087|30-ton Steam Crane]]<ref>SVR News 130</ref>. | ||
Latest revision as of 17:47, 7 December 2021
On June 26 in SVRSevern Valley Railway history.
- 1861 With construction of the Severn Valley Railway still in progress, a Special General Meeting of the Severn Valley Railway Co. was held to approve the application for a Bill to construct the Kidderminster Loop Line (this early proposal never came to fruition and the Loop was eventually completed by the GWRGreat Western Railway in 1878).[1]
- 1975 DRG 64 305 commenced its journey to the SVRSevern Valley Railway from Stolberg, West Germany, where the locomotive had been in store since purchase the previous year.
- 1999 A two-day working party was organise to re-rope the 30-ton Steam Crane[2].
See also
On this day in SVRSevern Valley Railway history
References
- ↑ Nabarro (1971) p. 51.
- ↑ SVRSevern Valley Railway News 130