Difference between revisions of "Folly Point Siding"

From SVR Wiki
Jump to: navigation, search
(add photo)
(add pictures etc)
Line 1: Line 1:
[[File:GWRplanFollyPoint.jpg|thumb|300px|right|Map showing the location of the siding]]
+
[[File:GWRplanFollyPoint.jpg|thumb|300px|right|Map showing the location of the siding (orientation differs from OS Map)]]
 +
[[File:OS Folly Point 1901.JPG|thumb|300px|right|Map showing the general locality]]
 
Folly Point siding was installed by the GWR for the use of contractors building the [[Elan Valley Aqueduct]]. It was situated to the west of the line and was controlled by two ground frames of two levers each, locked by a key on the electric train staff for the section.<ref name=JM>[[Bibliography#Books|Marshall (1989)]] p. 95.</ref>
 
Folly Point siding was installed by the GWR for the use of contractors building the [[Elan Valley Aqueduct]]. It was situated to the west of the line and was controlled by two ground frames of two levers each, locked by a key on the electric train staff for the section.<ref name=JM>[[Bibliography#Books|Marshall (1989)]] p. 95.</ref>
  

Revision as of 16:00, 30 November 2018

Map showing the location of the siding (orientation differs from OSOrdnance Survey Map)
Map showing the general locality

Folly Point siding was installed by the GWRGreat Western Railway for the use of contractors building the Elan Valley Aqueduct. It was situated to the west of the line and was controlled by two ground frames of two levers each, locked by a key on the electric train staff for the section.[1]

The siding was approved by the Board of Trade for use on 16 September 1899, and was removed when construction of the aqueduct was completed in 1906[1].

See also

Folly Point

References

  1. 1.0 1.1 Marshall (1989) p. 95.