Changes

Jump to: navigation, search

November 21

334 bytes added, 15:03, 7 November 2019
Info added
[[File:Kidderminster signal box.jpg |thumb|300px|right| Kidderminster Signal Box]]On {{PAGENAME}} in SVR history.
*1908 The [[Cleobury Mortimer and Ditton Priors Light Railway]] opened for passenger traffic.
*[[Severn Valley Railway Timeline 1980-1989#1987|1987]] The new [[Kidderminster Station signal box (1987 onwards)| Kidderminster signal box]] was commissioned, including the first use of a motorised point on the SVR.<ref>SVR News 87</ref><ref>[http://www.svrsig.org.uk/svr/Frame1.htm Kidderminster signal box on the SVR Signalling web site]</ref>
*[[Severn Valley Railway Timeline 1980-1989#1988|1988]] Work began on the construction of [[Bridgnorth Loco Works#Boiler shop|Bridgnorth Boiler Shop]].<ref>SVR News 90</ref>
*2000 [[BR Standard 9F 92212]] arrived to help operate the [[Christmas services|Santa Special services]], as the home fleet was at the time still recovering from the recent [[Severn Valley Railway Timeline 2000-2009#2000| boiler crisis]].
==See also==
Trustworthy, administrator
6,720
edits

Navigation menu