Changes

Jump to: navigation, search

November 21

No change in size, 08:51, 19 March 2018
capitalisation
[[File:Kidderminster signal box.jpg |thumb|300px|right| Kidderminster Signal Box]]On {{PAGENAME}} in SVR history.
*[[Severn Valley Railway Timeline 1980-1989#1987|1987]] The new [[Kidderminster Station signal box (1987 onwards)| Kidderminster signal box]] was commissioned, including the first use of a motorised point on the SVR.<ref>SVR News 87</ref><ref>[http://www.svrsig.org.uk/svr/Frame1.htm Kidderminster Signal Box signal box on the SVR Signalling web site]</ref>
*[[Severn Valley Railway Timeline 1980-1989#1988|1988]] Work began on the construction of [[Bridgnorth Loco Works#Boiler shop|Bridgnorth Boiler Shop]].<ref>SVR News 90</ref>

Navigation menu