Changes

Jump to: navigation, search

Bridgnorth Station Footbridge

15 bytes added, 15:11, 27 March 2018
m
add link
[[File:Plaque_20150528.jpg|300px|right|2004 plaque]]
This footbridge (Bridge 37) connects [[Bridgnorth|Bridgnorth Station's ]] Platforms 1 and 2. Although both platforms were present at opening on 1 February 1862, the footbridge was added later, its construction being authorised by the GWR on 12 May 1887.<ref>[[Bibliography#Books|Marshall (1989)]] p. 104.</ref>
The footbridge last underwent a major refurbishment in [[Severn Valley Railway Timeline 2000-2009#2004 | 2004]], when it was taken down and moved to the boiler shop for shot-blasting and powder coating, supported by funds from the SVR's arrangement with the [[West Bromwich Building Society]]. A plaque on Platform 2 celebrates the re-opening on 18 May 2004.
Trustworthy, administrator
11,870
edits

Navigation menu