LNER 24105 Open Third

124 bytes added, 19:52, 11 July 2017
2007 overhaul update
===2017 overhaul===
A major overhaul commenced on 3 January 2017 and is expected to take 6 8 months. Roof board refastening has meant a complete strip-down which will be followed by rebuilding with new canvass(fitted 4/7/17), rainstrips and tacking covers. Also underway completed is the obligatory window re-sealingwith new retaining beading and fresh sealent. A section of frame was found to be rotten due to a leaking window seal and this frame, together with some panels have been repaired. The old varnish has been was removed, the woodwork restored to its original colour, sanded, linseed oiled and varnished. The windows have been removed, re-bedded ; lining and signwriting were underway in fresh mastic, and new retaining beading fittedJuly. Internally the lighting has been improved with LED bulbs and reproduction LNER wall lamps whilst there will be cleaning and patch replacement of the Rexine and refurbishing of the now was either cleaned or where necessary, replaced. The rather tired tables recieved a re-varnish and seatingwere covered in linoleum in lieu of the old Rexine. New seat frames and ends have been constructed , and the seats and backs re-covered in reproduction LNER fawn patterned moquette to bring the latter it up to standard. The toilet is to be remodeled to improve its ambiance, increase available space, and simplify the plumbing.
<gallery>
Trustworthy
275
edits

Navigation menu