LNER 24105 Open Third

56 bytes added, 21:07, 16 May 2017
2017 overhaul update
===2017 overhaul===
A major overhaul commenced on 3 January 2017 and is expected to take 6 months. Roof board refastening has meant a complete strip-down which will be followed by rebuilding with new canvass, rainstrips and tacking covers. Also underway is the obligatory window re-sealing. A section of frame was found to be rotten due to a leaking window seal and this frame, together with some panels have been repaired. Most of the The old varnish has been removed, the woodwork restored to its original colour , sanded, linseed oiled and sandedvarnished. The windows have been removed, prior to re-varnishingbedded in fresh mastic, lining and lettering of the exteriornew retaining beading fitted. Internally there will be the lighting improvements (including has been improved with reproduction LNER wall lamps), whilst there will be cleaning and patch replacement of Rexine and refurbishing of the now rather tired tables and seating. New seat frames and ends have been constructed to bring the latter up to standard. The toilet is to be remodeled to improve its ambiance, increase available space, and simplify the plumbing.
<gallery>
Trustworthy
275
edits

Navigation menu