A large sand quarry was situated north of the cutting between the Wilden Lane Underbridge and Wilden Top Road Overbridge.  Access to the cutting was controlled by a ground frame at the western end, locked by the section token. The extract below from the OS map of 1927, surveyed in 1925, shows the size and extent of the siding which measured around 600ft in length. The date when the siding was commissioned is not recorded, although it does not appear on the previous OS map published in 1902. After the quarry closed, the siding was used to store coal wagons waiting to enter [[Stourport Power Station]]<ref>[[Bibliography#Books|Marshall (1989)]] p. 87.</ref>.
+
A large sand quarry was situated north of the cutting between the Wilden Lane Underbridge and Wilden Top Road Overbridge.  Access to the cutting was controlled by a ground frame at the western end, locked by the section token. The siding could be accessed either by Down trains or by trains being propelled from Stourport.<ref name="SA1960">Birmingham Traffic District Sectional Appendix 1960</ref> The extract below from the OS map of 1927, surveyed in 1925, shows the size and extent of the siding which measured around 600ft in length. The date when the siding was commissioned is not recorded, although it does not appear on the previous OS map published in 1902. After the quarry closed, the siding was used to store coal wagons waiting to enter [[Stourport Power Station]]<ref>[[Bibliography#Books|Marshall (1989)]] p. 87.</ref>.
 
<gallery mode=packed heights=200px style="text-align:left">
 
<gallery mode=packed heights=200px style="text-align:left">
 
OS_Wilden_1927.jpg|1927 OS Map showing Wilden Sand Siding
 
OS_Wilden_1927.jpg|1927 OS Map showing Wilden Sand Siding

Latest revision as of 21:16, 30 October 2021

OSOrdnance Survey Map Hartlebury to Stourport 1960
OSOrdnance Survey Map Wilden 1951, with the Sand Siding north of the line

Wilden Sand Siding served a sand quarry at Wilden, on the Stourport Branch between Hartlebury and Stourport

Early history

The Severn Valley Railway ran through a sandstone ridge at Wilden Top, around ¾ mile from Stourport. The railway could have passed through this via a tunnel as elsewhere on the line, but a large amount of spoil was required for a nearby embankment. As a result one of the largest cuttings on the line was constructed, around a third of a mile long and up to 60 ft deep. Unusually, a tunnel was first driven and laid with rails, then the ground above was dug away and dropped down shafts into wagons.[1]

Sand Quarry siding

A large sand quarry was situated north of the cutting between the Wilden Lane Underbridge and Wilden Top Road Overbridge. Access to the cutting was controlled by a ground frame at the western end, locked by the section token. The siding could be accessed either by DownIn reference to the direction of travel means away from the major terminus (i.e. towards Bridgnorth on the present day SVR) trains or by trains being propelled from Stourport.[2] The extract below from the OSOrdnance Survey map of 1927, surveyed in 1925, shows the size and extent of the siding which measured around 600ft in length. The date when the siding was commissioned is not recorded, although it does not appear on the previous OSOrdnance Survey map published in 1902. After the quarry closed, the siding was used to store coal wagons waiting to enter Stourport Power Station[3].

See also

References

  1. Marshall (1989) p. 41.
  2. Birmingham Traffic District Sectional Appendix 1960
  3. Marshall (1989) p. 87.