Talk:The Severn Valley Railway in preservation

From SVR Wiki
Revision as of 12:09, 5 January 2017 by Patrick Hearn (talk | contribs) (Creating the history: Internal structures still correct?)
Jump to: navigation, search

Creating the history

I am currently reading through a recently acquired collection of old SVRSevern Valley Railway news and adding things to this history year by year as time allows. I do not own the history section so please feel free to add your own items or edit what is there.
As an experiment I changed style in 1980 from present tense bullet points to past tense more textual style. On balance I prefer the latter, so I will re-format 1967-1979 at some point unless lots of people feel strongly the other way. Any other feedback or suggestions welcomed. --Robin (talk) 17:45, 31 January 2015 (UTC)

MPDMotive Power Depot

Do the ESMPEngineering Services, Motive Power. changes referred to in GM updates over the recent years require the internal structure to be amended? --Patrick Hearn (talk) 12:09, 5 January 2017 (UTC)--Patrick Hearn (talk) 12:09, 5 January 2017 (UTC)