Difference between revisions of "Talk:Severn Valley Railway Timeline 1970-1979"
From SVR Wiki
(Pensnett box - where was it brought to and erected?) |
(Pensnett box at BH/HL) |
||
Line 1: | Line 1: | ||
Wasn't Pensnett box rebuilt at Bridgnorth, other pages say so? The Jan 1970 entry says Hampton Loade. I don't want to change something if that's wrong. Help pleae!--[[User:Patrick Hearn|Patrick Hearn]] ([[User talk:Patrick Hearn|talk]]) 20:47, 17 December 2019 (UTC) | Wasn't Pensnett box rebuilt at Bridgnorth, other pages say so? The Jan 1970 entry says Hampton Loade. I don't want to change something if that's wrong. Help pleae!--[[User:Patrick Hearn|Patrick Hearn]] ([[User talk:Patrick Hearn|talk]]) 20:47, 17 December 2019 (UTC) | ||
+ | :Both entries are correct. The top floor of the Pensnett box was moved to Bridgnorth in November 1968, where it was installed on the (shortened) brick base during 1969.<ref>SVR News 11, p.19.</ref> The wooden ground floor sections were left in situ at Pensnett; they were then taken apart in January 1970 and moved to Hampton Loade where they were used in rebuilding the partly demolished box there.<ref>SVR News 16, p.18.</ref> --[[User:Robin|Robin]] ([[User talk:Robin|talk]]) 21:40, 17 December 2019 (UTC) | ||
+ | |||
+ | ==References== | ||
+ | <references/> |
Latest revision as of 21:40, 17 December 2019
Wasn't Pensnett box rebuilt at Bridgnorth, other pages say so? The Jan 1970 entry says Hampton Loade. I don't want to change something if that's wrong. Help pleae!--Patrick Hearn (talk) 20:47, 17 December 2019 (UTC)
- Both entries are correct. The top floor of the Pensnett box was moved to Bridgnorth in November 1968, where it was installed on the (shortened) brick base during 1969.[1] The wooden ground floor sections were left in situ at Pensnett; they were then taken apart in January 1970 and moved to Hampton Loade where they were used in rebuilding the partly demolished box there.[2] --Robin (talk) 21:40, 17 December 2019 (UTC)