Changes

Jump to: navigation, search

Severn Valley Railway Timeline 2010-2019

867 bytes added, 11:48, 11 March 2018
Added Dunrobin, Eardington and SSG 2018 updates
:On 16 February the railway announced 2017 [[SVR Passenger numbers‎ |passenger numbers]] of 240,686, a reduction of 11,644 from 2016.
:Also on 16 February the railway announced its 2018 fare structure, with the removal of the 'senior' fare discount for normal services (but not for galas).
:The start of the 2018 season with half-term running was met with heavy snow, despite which the service operated as planned. Temporary withdrawal of the [[Class 108 DMU]] for additional maintenance meant an all-steam service was provided for most of the opening week.
:Beamish announced that testing of the wheel centres on long-term contract overhaul locomotive [[Sharp Stewart 0-4-4T Dunrobin]] revealed many cracked spokes, and the decision to replace all four coupled wheels.
 
'''March 2018'''
:At [[Eardington]] contractors finished brickwork for the restored platform, incorporating around 6,000 GWR bricks reclaimed and donated from the GWR main line electrification.
:The Spring Steam Gala was unusual with only three of the home fleet (1450, 1501 and 7714) timetabled for use, with six [[Steam Locomotives visiting the SVR for galas|visiting locomotives]].
==Locomotives used==
Trustworthy, administrator
6,720
edits

Navigation menu