Changes

Jump to: navigation, search

Severn Valley Railway Timeline 2010-2019

5 bytes added, 17:36, 9 March 2018
m
edit link
[[File:Countryfile_20150315.jpg |thumb|150px|right| Heritage Site of the Year]]
'''January-February 2015'''
:The winter saw a major infrastructure project, initiated by Severn Trent Water, which involved replacing three of the four large diameter water pipes bringing water from the Elan Valley to Birmingham where they cross under the trackbed between Bewdley and Arley near [[Folly Point]]. The replacement work was carried out by STW's contractors, but SVR staff and volunteers removed and replaced the trackbed and signalling equipment to enable the work to be carried out. Due to the lack of good road access to the aqueduct, the replacement pipes were transported from [[Bewdley]] station to the worksite by rail, using contracted SVR equipment in the form of diesel shunter [[Ruston and Hornsby 165hp Diesel Shunter 319290|319290]] and [[GWR 60841 Bogie Bolster|Gane 'A' 60841]] <ref>httphttps://www.svrlive.com/Pages/Infrastructure.aspx</ref>. The project over-ran, meaning the first 3 days of re-opening for half term week could not run between Bewdley and Highley.
:Other winter infrastructure work included replacement of the points and installation of improved drainage at the south end of Arley station. Restoration work was also carried out on Bewdley South (Sandbourne) and Bewdley North (Wribbenhall) viaducts.
:On 17 September, newly overhauled [[BR Class 50 50031 Hood]] was re-dedicated in a ceremony at Kidderminster. The event marked two anniversaries; 100 years since the keel of HMS Hood was laid in 1916 and 75 years since the ship was sunk by the German battleship Bismark during World War 2.
:The SVR staged 'Pacific Power' featuring the first meeting of LNER A1 60103 Flying Scotsman and LNER-design 60163 Tornado. On Wednesday 21 September, Flying Scotsman hauled three round trips for around 1,200 supporters of the [[Severn Valley Railway Charitable Trust Ltd | SVR Charitable Trust]]. The next five days saw four round trips per day using one locomotive from Kidderminster to Bridgnorth and the other for the return. The special services ran with a full rake of 9 Gresley teaks, the first time that nine teak coaches have run together since 2 May 1964 (by then repainted into BR maroon).<ref>[https://forum.svr-online.org.uk/viewtopic.php?p=51701#51701 SVRA Forum]</ref> The visitors were supported by home locomotives including the SVR-based Pacifics [[SR 34027 Taw Valley | Taw Valley]] and [[SR 34053 Sir Keith Park | Sir Keith Park]]. The event, which saw a total of 15,267 visitors and a result of over £280,000 [httphttps://www.svrlive.com/copy-of-news-300516-1-4 'Pacific Power event September 2016', SVRLive], replaced the traditional Autumn Steam Gala.
'''November 2016'''
'''December 2016'''
:GWR Collett 5700 class 0-6-0PT ‘Pannier Tank’ [[GWR Pannier 7714 | 7714]] returned after overhaul with testing under load at Bridgnorth.
:By the end of 1 December - exactly one month since the programme’s launch - applications to purchase shares in the railway at a price of £1 each had passed the half a million mark.<ref>[http://www.shropshirestar.com/news/transport-news/2016/12/06/share-offer-hits-500000/#TdbxEHk6UeemW9k0.99 Shropshire Star 6 December 2016]</ref> and 650,000 by 23 December.<ref>[httphttps://www.svrlive.com/copy-of-shareholders SVRLive] (retrieved 3 January 2017)</ref>
:The National Railway Heritage Awards committee awarded [[Arley]] [[Awards | 'The Stagecoach Volunteers Award 2016']] for their outstanding dedication to maintaining and preserving Arley station. [[Bewdley]] was “Highly Commended” in the 'Great Western Railway Craft Skills Award' category recognising their work on the major restoration of the unique island platform canopy of platforms 2 and 3.<ref>SVR Noticeboard Issue</ref>
:The Festive Season trains from 26 December were sufficiently busy for an additional steam diagram to be added from 28 December to 2 January 2017.
:All piling work was completed on the Bridgnorth development project, with work to start in January 2017 to produce the reinforced concrete ring beam to tie all the pile heads together<ref>[httphttps://www.svrlive.com/bridgnorth-development SVRLive] (retrieved 3 January 2017)</ref>.
==2017==
:On 1-2 January [[SR 34053 Sir Keith Park]] completed farewell turns in advance of her departure to the Swanage Railway on 10 January
:The SVR announced the hire of [[Diesel Locomotives hired by the SVR|diesels 37688 and 40145]] for 2018-2019, the former for PWay work and the latter to utilise its steam heat capability. [[BR Class 50 50026 Indomitable|50026 Indomitable]] arrived for commercial repairs in the [[Diesel Depot]]. Didcot Railway Centre announced 6023 'King Edward II' would be moved by road to the SVR in February for testing of her revised draughting, then operating some timetabled trains and attending the Spring gala.
:Winter works saw track either side of [[Bewdley Tunnel]] being cleaned of badly contaminated ballast; the last part of the remedial work to the embankment slippage around the [[Accommodation bridge near Severn Lodge|County Boundary]] area; the partial rebuilding of the platform face at [[Eardington]]; lining of the loco water tank at [[Kidderminster]], and at the same location swapping the water column adjacent to platform 1 runround from a fixed column to a standard GWR swing arm type. At [[Waterworks Crossing|Waterworks straight]] welding was completed to a position that restored line speed following Winter Works in 2017. Permanent Way work also took place at [[Highley|Highley bank]] and [[Kidderminster Carriage Shed]].<ref>[httphttps://www.svrlive.com/winter-works-2018 SVRLive]</ref>
:On 16 January [[Severn Valley Railway Charitable Trust Ltd|the Charitable Trust]] announced it had reached its appeal target of £10,000 in under a month, for the cost of repairing the vehicles damaged by graffiti in December.
:The railway's published fare structure withdrew discounted fares for Seniors (60+), who instead paid the full adult fare. In addition, it introduced a version of the [[Annual Family Pass]] for single adults.
Trustworthy, administrator
11,932
edits

Navigation menu