Changes

Jump to: navigation, search

September 6

No change in size, 11:21, 5 March 2020
m
Typo
*1972 GWR carriages [[GWR 9055 Nondescript Saloon|9055]], [[GWR 9369 Nondescript Saloon|9369]] and [[GWR 9627 Restaurant Third|9627]] arrived on the SVR
*[[Severn Valley Railway Timeline 1980-1989#1982 | 1982]] [[LNWR 3020 Cornwall]] returned by road to the NRM at York after a period in residence on the SVR. A planned restoration could not be carried out as the cost of boiler repairs proved prohibitive.<ref>SVR News 65</ref>.
*2016 The Heritage Lottery Fund Committee for West Midlands declined a grant application for [[Falling Sands Viaduct]]. A successful application followed in 2019.
*2017 The Shropshire Star reported a contractor had been appointed to handle the first stage of demolition at the former [[Ironbridge power station]]<ref>[https://www.shropshirestar.com/news/local-hubs/telford/ironbridge/2017/09/06/contractor-to-begin-demolition-at-ironbridge-power-station-on-monday/ Shrophire Star 6 September 2017]</ref>.
Trustworthy, administrator
6,649
edits

Navigation menu