Changes

Jump to: navigation, search

Rolling stock currently under restoration

100 bytes removed, 11:44, 11 July 2020
7284 added, 2886 in service carrying parcels (SVR News 210)
! style="width: 10%;" | [[Carriages]] !! style="width: 10%;" | Location !! style="width: 10%;" | Completion due !! style="width: 10%;" | External link !! style="width: 10%;" | Notes
|-
| [[Barry Railway Carriage 163]] || [[Hampton Loade]] ||2020 || || The Trust's aim is to get Barry Railway carriage 163 back into traffic in time for its 125th birthday in 2020
|-
| [[GWR 2119 Full Third]] || [[Bewdley Down Yard]] || || ||
|-
| [[LMS 2886 Six-wheel Passenger GWR 2242 Corridor Brake (later 32919)Third]] || [[Carriage Repair Works|Kidderminster Carriage Repair Works]] || At topcoat and lining out stage <ref>2020 || [http://www.gw-svr-a.org.uk/news.html GW(SVR )A News 203</ref> ] || ||
|-
| [[GWR 2242 Corridor Brake Third7284 Composite]] || [[Carriage Repair Works|Kidderminster Carriage Repair WorksShed]] || 2020 || <ref>[httphttps://www.gw-svr-asvrlive.org.ukcom/news.html GWbljun20 Branch Lines, June 2020] (SVRRetrieved 11 July 2020)A News] </ref> ||
|-
| [[GWR 4786 Full Third]] || [[Bewdley Down Yard]] || Long term Project ||[http://www.gw-svr-a.org.uk/4786-restoration.html GW(SVR)A News] ||
| [[GWR 9615 Kitchen Diner First]] || [[Bewdley Down Yard]] ||Long term Project || || Inside the Paint Shop. A back-to-the floor restoration
|-
| [[BR 16169 Composite Corridor]] || [[Carriage Repair Works|Kidderminster Carriage Repair Works]] || 2018|| || Being overhauled as events permit. Awaits full mechanical check up<ref>SVR News 200, 210</ref>
|-
| [[LMS Brake Third Corridor 26921]] || [[Bridgnorth]] || Long term Project || ||
Trustworthy, administrator
6,661
edits

Navigation menu