Changes

Jump to: navigation, search

Rolling stock currently under restoration

67 bytes added, 13:21, 23 October 2022
2119 removed, overhaul did not commence. 2426 added
| [[Barry Railway Carriage 163]] || [[Hampton Loade]] || || || In April 2022 the owning Trust announced that they and the Railway had agreed that 163 will leave the SVR<ref>[https://www.facebook.com/BarryRailwayCarriageTrust/photos/a.510853185709465/4949080231886716 Barry Railway Carriage Trust on Facebook, 30 April 2022]</ref>.
|-
| [[GWR 2119 Full 2242 Corridor Brake Third]] || [[Bewdley Down YardCarriage Repair Works|Kidderminster Carriage Repair Works]] || || [http://www.gw-svr-a.org.uk/news.html GW(SVR)A News] || Overhaul has commenced but is paused waiting work on hold until [[GWR 9615 Kitchen Diner First|9615]] is complete.the roof at and space in Bewdley Down Yard
|-
| [[GWR 2242 Corridor Brake 2426 Toplight Full Third]] || [[Carriage Repair Works|Kidderminster Carriage Repair WorksBewdley Down Yard]] || 2022 Long term Project || [http://www.gw-svr-a.org.uk/news2426-restoration.html GW(SVR)A News] ||
|-
| [[GWR 4786 Full Third]] || [[Bewdley Down Yard]] || Long term Project ||[http://www.gw-svr-a.org.uk/4786-restoration.html GW(SVR)A News] ||
Trustworthy, administrator
6,693
edits

Navigation menu