Difference between revisions of "November 10"

From SVR Wiki
Jump to: navigation, search
(Created page with "On {{PAGENAME}} in SVR history. *1997 The P-Way department began relaying the motor points at the north end of Kidderminster...")
 
(6634)
Line 2: Line 2:
  
 
*[[Severn Valley Railway Timeline 1990-1999#1997|1997]] The P-Way department began relaying the motor points at the north end of Kidderminster loop. Renewal work in [[Kidderminster signal box]] was in progress at the same time.<ref>SVR News 126</ref>
 
*[[Severn Valley Railway Timeline 1990-1999#1997|1997]] The P-Way department began relaying the motor points at the north end of Kidderminster loop. Renewal work in [[Kidderminster signal box]] was in progress at the same time.<ref>SVR News 126</ref>
 +
*[[Severn Valley Railway Timeline 2010-2019#2017|2017]] [[6634|GWR 0-6-2T 6634]] left the SVR, departing by road for Peak Rail where owning group [[The Waterman Railway Heritage Trust]] is based.
 
==See also==
 
==See also==
  

Revision as of 16:18, 10 November 2017

On November 10 in SVRSevern Valley Railway history.

See also

On this day in SVRSevern Valley Railway history

← November 9 - November 11 →

References

  1. SVRSevern Valley Railway News 126