Difference between revisions of "November 10"

From SVR Wiki
Jump to: navigation, search
(Created page with "On {{PAGENAME}} in SVR history. *1997 The P-Way department began relaying the motor points at the north end of Kidderminster...")
 
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
On {{PAGENAME}} in SVR history.
+
[[File:GWR 6634 20171108.jpg|thumb|300px|right|6634 awaiting collection in November 2017]]On {{PAGENAME}} in SVR history.
  
 
*[[Severn Valley Railway Timeline 1990-1999#1997|1997]] The P-Way department began relaying the motor points at the north end of Kidderminster loop. Renewal work in [[Kidderminster signal box]] was in progress at the same time.<ref>SVR News 126</ref>
 
*[[Severn Valley Railway Timeline 1990-1999#1997|1997]] The P-Way department began relaying the motor points at the north end of Kidderminster loop. Renewal work in [[Kidderminster signal box]] was in progress at the same time.<ref>SVR News 126</ref>
 +
*[[Severn Valley Railway Timeline 2010-2019#2017|2017]] [[6634|GWR 0-6-2T 6634]] left the SVR,<ref>[https://forum.svr-online.org.uk/viewtopic.php?t=1217&start=105 SVR-Online Forum]</ref> departing by road for Peak Rail where owning group [[The Waterman Railway Heritage Trust]] is based.
 
==See also==
 
==See also==
  

Latest revision as of 13:46, 5 November 2018

6634 awaiting collection in November 2017
On November 10 in SVRSevern Valley Railway history.

See also

On this day in SVRSevern Valley Railway history

← November 9 - November 11 →

References

  1. SVRSevern Valley Railway News 126
  2. SVR-Online Forum