[[File: MEWP_20210604.jpg|thumb|300px|right| Mobile Elevating Work Platform]] | [[File: MEWP_20210604.jpg|thumb|300px|right| Mobile Elevating Work Platform]] | ||
− | The SVR acquired this '''Mobile Elevating Work Platform''' (MEWP) in November 2020. A [https://www.youtube.com/watch?v=haiVz-CTt64 video] was published on the the SVR YouTube channel. | + | The [[SVR(H)]] acquired this '''Mobile Elevating Work Platform''' (MEWP) in November 2020. A [https://www.youtube.com/watch?v=haiVz-CTt64 video] was published on the the SVR YouTube channel. The purchase was partly funded by [[Severn Valley Railway Company Limited]], the "Guarantee Company".<ref>[https://www.svrlive.com/epjun22 Express Points June 2022]</ref> |
− | Its [[Carriage and Wagon numbering#UIC numbers|EVN/RIV number]] is 99709 942098-3. The previous owners were Promax Access and it carried the Fleet Number 008.<ref>OnTrackPlant.com</ref> | + | It is manufactured by Platform Basket, one of the largest aerial platform manufacturers in Italy. Its [[Carriage and Wagon numbering#UIC numbers|EVN/RIV number]] is 99709 942098-3. The previous owners were Promax Access and it carried the Fleet Number 008.<ref>OnTrackPlant.com</ref> |
The MEWP has road-rail capability. It is mainly used by the S&T Dept for signal post access. The replacement of the [[Bewdley South signal box|Bewdley South wooden bracket signal]] in October 2020 involved the hire of a MEWP which, it was reported, "...''was invaluable as it allowed us to do all the necessary work without having to climb any signal ladders''".<ref>[https://www.svrlive.com/bloct20 Branch Lines October 2020]</ref> The SVR acquired its own MEWP the following month. | The MEWP has road-rail capability. It is mainly used by the S&T Dept for signal post access. The replacement of the [[Bewdley South signal box|Bewdley South wooden bracket signal]] in October 2020 involved the hire of a MEWP which, it was reported, "...''was invaluable as it allowed us to do all the necessary work without having to climb any signal ladders''".<ref>[https://www.svrlive.com/bloct20 Branch Lines October 2020]</ref> The SVR acquired its own MEWP the following month. |
Revision as of 12:53, 10 December 2022
The SVR(H) acquired this Mobile Elevating Work Platform (MEWPMobile elevating work platform) in November 2020. A video was published on the the SVRSevern Valley Railway YouTube channel. The purchase was partly funded by Severn Valley Railway Company Limited, the "Guarantee Company".[1]
It is manufactured by Platform Basket, one of the largest aerial platform manufacturers in Italy. Its EVN/RIV number is 99709 942098-3. The previous owners were Promax Access and it carried the Fleet Number 008.[2]
The MEWPMobile elevating work platform has road-rail capability. It is mainly used by the S&TSignals & Telegraph Dept for signal post access. The replacement of the Bewdley South wooden bracket signal in October 2020 involved the hire of a MEWPMobile elevating work platform which, it was reported, "...was invaluable as it allowed us to do all the necessary work without having to climb any signal ladders".[3] The SVRSevern Valley Railway acquired its own MEWPMobile elevating work platform the following month.
It is also sometimes used by other departments, as for example on 29 January 2021 the IT department installed a high-speed data network on the Kidderminster site, the MEWPMobile elevating work platform used in installing radio links in several locations in Kidderminster Carriage Shed. The project was funded by the Department of Media, Culture & Sport’s Culture Recovery Fund COVID-19 grant.[4]
The picture below shows the MEWPMobile elevating work platform in use at Kidderminster in May 2021. Also visible is the old Kidderminster Footbridge which was replaced during 2022.
In January 2022 the MEWPMobile elevating work platform was used in maintaining the down distant signal on its first visit to Hampton Loade. A report of the work was published in Branchlines.
See also
References
- ↑ Express Points June 2022
- ↑ OnTrackPlant.com
- ↑ Branch Lines October 2020
- ↑ Branch Lines February 2021
Links
- 'The Severn Valley Railway has an exciting new piece of engineering equipment', 6 November 2020 on the SVRSevern Valley Railway YouTube channel
- 'Behind the scenes: heritage signalling maintenance on the Severn Valley Railway 2021', 22 January 2021 on the SVRSevern Valley Railway YouTube channel
- MEWP 99709 942098-3 on OnTrackPlant.com
- Platform Basket website