March 19
From SVR Wiki
On March 19 in SVRSevern Valley Railway history.
- 1972 The telegraph pole route between Bridgnorth and Hampton Loade was completed with the erection of the final pole near Sterns[1].
See also
On this day in SVRSevern Valley Railway history
References
- ↑ SVRSevern Valley Railway News 24