Difference between revisions of "March 19"

From SVR Wiki
Jump to: navigation, search
m (add pictures etc)
Line 3: Line 3:
 
*[[Severn Valley Railway Timeline 1970-1979#1972 | 1972]] The telegraph pole route between [[Bridgnorth]] and [[Hampton Loade]] was completed with the erection of the final pole near [[Sterns]]<ref>SVR News 24</ref>.
 
*[[Severn Valley Railway Timeline 1970-1979#1972 | 1972]] The telegraph pole route between [[Bridgnorth]] and [[Hampton Loade]] was completed with the erection of the final pole near [[Sterns]]<ref>SVR News 24</ref>.
 
   
 
   
 +
==Gallery==
 +
Pictures taken on 19 March:
 +
<gallery>
 +
102691_20160319.jpg|2016: Signwriting in [[Bewdley Down Yard|Bewdley yard]]
 +
GWR_41277_20160319.jpg|2016: [[GWR 41277 4 plank Open Goods Wagon]] at Bewdley
 +
</gallery>
 +
 
==See also==
 
==See also==
  

Revision as of 22:20, 18 March 2018

On March 19 in SVRSevern Valley Railway history.

Gallery

Pictures taken on 19 March:

See also

On this day in SVRSevern Valley Railway history

← March 18 - March 20 →

References

  1. SVRSevern Valley Railway News 24