Difference between revisions of "March 19"
From SVR Wiki
m (add pictures etc) |
|||
Line 3: | Line 3: | ||
*[[Severn Valley Railway Timeline 1970-1979#1972 | 1972]] The telegraph pole route between [[Bridgnorth]] and [[Hampton Loade]] was completed with the erection of the final pole near [[Sterns]]<ref>SVR News 24</ref>. | *[[Severn Valley Railway Timeline 1970-1979#1972 | 1972]] The telegraph pole route between [[Bridgnorth]] and [[Hampton Loade]] was completed with the erection of the final pole near [[Sterns]]<ref>SVR News 24</ref>. | ||
+ | ==Gallery== | ||
+ | Pictures taken on 19 March: | ||
+ | <gallery> | ||
+ | 102691_20160319.jpg|2016: Signwriting in [[Bewdley Down Yard|Bewdley yard]] | ||
+ | GWR_41277_20160319.jpg|2016: [[GWR 41277 4 plank Open Goods Wagon]] at Bewdley | ||
+ | </gallery> | ||
+ | |||
==See also== | ==See also== | ||
Revision as of 22:20, 18 March 2018
On March 19 in SVRSevern Valley Railway history.
- 1972 The telegraph pole route between Bridgnorth and Hampton Loade was completed with the erection of the final pole near Sterns[1].
Gallery
Pictures taken on 19 March:
2016: Signwriting in Bewdley yard
2016: GWR 41277 4 plank Open Goods Wagon at Bewdley
See also
On this day in SVRSevern Valley Railway history
References
- ↑ SVRSevern Valley Railway News 24