Difference between revisions of "June 26"
From SVR Wiki
(Created page with "On {{PAGENAME}} in SVR history. *1861 With construction of the Severn Valley Railway still in progress, a Special General Meeting of the Severn Valley Railway Co. was held to...") |
|||
Line 2: | Line 2: | ||
*1861 With construction of the Severn Valley Railway still in progress, a Special General Meeting of the Severn Valley Railway Co. was held to approve the application for a Bill to construct the [[Kidderminster Loop]] (this early proposal never came to fruition and the Loop was eventually completed by the GWR in 1878).<ref>[[Bibliography#Books|Nabarro (1971)]] p. 51.</ref> | *1861 With construction of the Severn Valley Railway still in progress, a Special General Meeting of the Severn Valley Railway Co. was held to approve the application for a Bill to construct the [[Kidderminster Loop]] (this early proposal never came to fruition and the Loop was eventually completed by the GWR in 1878).<ref>[[Bibliography#Books|Nabarro (1971)]] p. 51.</ref> | ||
+ | *1999 A two-day working party was organise to re-rope the [[Cowans Sheldon 30-ton steam crane RS 1087|30-ton Steam Crane]]<ref>SVR News 130</ref>. | ||
==See also== | ==See also== |
Revision as of 21:18, 18 June 2018
On June 26 in SVRSevern Valley Railway history.
- 1861 With construction of the Severn Valley Railway still in progress, a Special General Meeting of the Severn Valley Railway Co. was held to approve the application for a Bill to construct the Kidderminster Loop (this early proposal never came to fruition and the Loop was eventually completed by the GWRGreat Western Railway in 1878).[1]
- 1999 A two-day working party was organise to re-rope the 30-ton Steam Crane[2].
See also
On this day in SVRSevern Valley Railway history
References
- ↑ Nabarro (1971) p. 51.
- ↑ SVRSevern Valley Railway News 130