Difference between revisions of "June 26"

From SVR Wiki
Jump to: navigation, search
(Created page with "On {{PAGENAME}} in SVR history. *1861 With construction of the Severn Valley Railway still in progress, a Special General Meeting of the Severn Valley Railway Co. was held to...")
 
Line 2: Line 2:
  
 
*1861 With construction of the Severn Valley Railway still in progress, a Special General Meeting of the Severn Valley Railway Co. was held to approve the application for a Bill to construct the [[Kidderminster Loop]] (this early proposal never came to fruition and the Loop was eventually completed by the GWR in 1878).<ref>[[Bibliography#Books|Nabarro (1971)]] p. 51.</ref>
 
*1861 With construction of the Severn Valley Railway still in progress, a Special General Meeting of the Severn Valley Railway Co. was held to approve the application for a Bill to construct the [[Kidderminster Loop]] (this early proposal never came to fruition and the Loop was eventually completed by the GWR in 1878).<ref>[[Bibliography#Books|Nabarro (1971)]] p. 51.</ref>
 +
*1999 A two-day working party was organise to re-rope the [[Cowans Sheldon 30-ton steam crane RS 1087|30-ton Steam Crane]]<ref>SVR News 130</ref>.
  
 
==See also==
 
==See also==

Revision as of 21:18, 18 June 2018

On June 26 in SVRSevern Valley Railway history.

  • 1861 With construction of the Severn Valley Railway still in progress, a Special General Meeting of the Severn Valley Railway Co. was held to approve the application for a Bill to construct the Kidderminster Loop (this early proposal never came to fruition and the Loop was eventually completed by the GWRGreat Western Railway in 1878).[1]
  • 1999 A two-day working party was organise to re-rope the 30-ton Steam Crane[2].

See also

On this day in SVRSevern Valley Railway history

← June 25 - June 27 →

References

  1. Nabarro (1971) p. 51.
  2. SVRSevern Valley Railway News 130