Difference between revisions of "Highley Station foot crossing"
From SVR Wiki
(add picture) |
|||
Line 1: | Line 1: | ||
+ | [[File: Highley_Foot_Crossing_20150528.jpg|thumb|300px|right| Highley foot crossing]] | ||
[[Highley|Highley Station]] foot crossing provides a ground level connection between [[Highley | Highley Station]] and [[The Engine House]]. However it cannot be used when trains are approaching or occupying the station. [[Highley Station Footbridge]] was built in 2009 to provide an alternative method of crossing. | [[Highley|Highley Station]] foot crossing provides a ground level connection between [[Highley | Highley Station]] and [[The Engine House]]. However it cannot be used when trains are approaching or occupying the station. [[Highley Station Footbridge]] was built in 2009 to provide an alternative method of crossing. | ||
Revision as of 16:17, 12 June 2015
Highley Station foot crossing provides a ground level connection between Highley Station and The Engine House. However it cannot be used when trains are approaching or occupying the station. Highley Station Footbridge was built in 2009 to provide an alternative method of crossing.
See also
Towards Kidderminster
List of infrastructure
Towards Bridgnorth