Changes

Jump to: navigation, search

Ground Frames at Foley Park

24 bytes added, 22:00, 21 June 2020
m
Foley Park (2020): add link
==Foley Park (2020)==
Over the winter of 2019/2020, during track relaying, the SVR took the opportunity to install a the refurbished ex-[[Kidderminster ground frame ]] at [[Foley Park]], in preparation for possible future uses of the site. These include a possible future station serving the [[Safari Park]] and developments on the former sugar works site, and the proposed [[Wagon Review Group|Wagon shed]].
== References ==
Trustworthy, administrator
11,876
edits

Navigation menu