February 23

Revision as of 15:38, 11 July 2019 by Robin (talk | contribs)

On February 23 in SVR history.

  • 1970 As a condition of opening the line, the SVR agreed with Shropshire County Council that the SVR would be fully responsible for the cost of Bridgnorth Bypass Bridge in the event of the Bypass being built.
  • 2010 The internal enquiry team's report into the previous year's Hampton Loade derailment was presented to the SVR(H) Board. The recommendations were accepted in full[1].

See also

On this day in SVR history

← February 22 - February 24 →
  1. SVR News 169