Elan Valley Aqueduct

5,860 bytes added, 16:44, 25 May 2022
2014-15 engineering work: add picture
[[File:River_Severn,Bewdley_Aqueduct_-_geograph.org.uk_-_1712149.jpg |thumb|300px|right| Elan Valley Aqueduct from the opposite bank (Wikimedia Commons)]]
The '''Elan Valley aqueduct Aqueduct'''<ref group="note">Sometimes abbreviated to "Elan Aqueduct".</ref> can be seen from the Railway where it crosses over the [[River Severn near ]] at Bath Coppice, just south of [[Folly Point]] between [[Bewdley]] and [[Arley]]. The pipes it carries are part of a network aqueduct runs for 73 miles from the Elan Valley reservoirs in mid-Wales to Frankley reservoir near Birmingham. It was installed in the early 1900s and the water it brings is now used to bring supply the towns of Mamble and Tenbury as well as the City of Birmingham. No pumping is required as there is a height difference of 771 feet between the ends of the route which allows the water from the Elan Valley in Wales to flow under gravity at around 2 mph, taking a day and a half to complete the city journey. At times of Birminghampeak demand the supply is supplemented by water from nearby [[Trimpley Reservoirs & Waterworks | Trimpley Reservoir]]<ref>[https://www.stwater.co.uk/leisure-and-learning/reservoir-locations/trimpley/*/tab/about/ Severn Trent Water] (Retrieved 4 December 2015)</ref>.
After crossing ==Construction==Parliament passed a Bill in 1892 approving a plan by Birmingham Corporation to build a series of dams and reservoirs in the aqueduct, the pipes run through Elan Valley to provide a chamber underneath clean supply of drinking water for the railwayCity of Birmingham. In Work on the [[Severn Valley Railway Timeline 2010-2019#2015 | winter dams and reservoirs began in 1893, with construction of 2014-2015]] three of these pipes were replaced the aqueduct itself starting in a major project initiated by Severn Trent Water; this required the line to lifted and replaced1896. The Chief Engineer was James Mansergh.
Water from Crossing the Aqueduct is now used to supply River Severn required the towns construction of Mamble and Tenbury as well as a large single-span bridge. After crossing the City river, the water pipes run through a chamber underneath the railway before continuing uphill towards Birmingham; the location being the lowest point of Birmingham. At times a 17-mile-long inverted syphon whose two outermost points are level, with the water passing through under the pressure of peak demand the supply is supplemented by head of water from nearby [[Trimpley Reservoirs & Waterworks | Trimpley Reservoir]]behind.<refname=SVR190>[https://www.stwater.co.uk/leisure-and-learning/reservoir-locations/trimpley/*/tab/about/ Severn Trent Water] (Retrieved 4 December 2015)SVR News 190, ''The Elan Valley Pipeline Replacement'', Chris Bond</ref>
During construction, a [[Folly Point Siding | temporary siding]] was provided at Folly Point.<gallerymode=packed heights=200px style="text-align:left">File:GWRplanFollyPoint.jpg | GWR plan showing the location of the siding.File:Aqueduct construction.jpg | The Aqueduct under construction</gallery> The first continuous flow of water from the Elan Valley through the aqueduct began on 28 July 1904, a week after the system was ceremonially opened by King Edward VII. The aqueduct initially consisted of two 42in-diameter pipes, with two additional pipes of 60in diameter being added in 1939 and 1961<ref name=SVR190/><ref>[https://industrialtour.co.uk/elan-valley-aqueduct/#:~:text=The%20Elan%20Valley%20Aqueduct%20carries,markers%20for%20picturesque%20walking%20routes Industrial Tour.co.uk]</ref>. ==2014-15 engineering work==During 2014 Severn Trent Water identified that three of the pipes in the chamber underneath the railway were corroded and required replacement. With the agreement and cooperation of the SVR, a project to carry out the work was undertaken over the [[Severn Valley Railway Timeline 2010-2019#2015 | winter of 2014-2015]]. The project required the line to be lifted and replaced, and this was planned for the six-week shutdown between Christmas and half-term in February. With road access to the location being extremely limited, the SVR arranged for all plant, equipment and materials to be delivered via the Railway from Bewdley. The SVR also provided the use of [[Ruston and Hornsby 165hp Diesel Shunter 319290|Ruston shunter D2957]] and crew, resulting in a rare opportunity for revenue-earning freight movement. <gallery mode=packed heights=200px style="text-align:left">D2957STW.jpg |D2957 at Bewdley with STW equipmentElan_Valley_Pipe_Replacement.jpg|Excavation in progress at the siteD2957_with_pipes.jpg|D2957 at the [[Tenbury Wall]] with pipes aboard [[BR 996730 Rail Carrier|Gane A 996730]]</gallery> Unfortunately, several factors arose to delay completion of the work. In December 1968 an explosion at West Hagley, at a point where the pipelines cross the Kidderminster to Stourbridge railway, fractured two of four water pipes, after which the Water Authority had decided to flood the pipeline chamber under the railway with concrete to prevent a similar attack.<ref>[https://api.parliament.uk/historic-hansard/commons/1968/dec/02/birmingham-water-pipeline-explosion Hansard HC Deb 2 December 1968 vol 774 cc1035-8]</ref> This needed to be removed slowly and carefully with high pressure water jet, so as not to damage the pipes which were still carrying water.<ref name=SStar>[https://www.shropshirestar.com/news/2015/02/19/shropshire-aqueduct-pipe-revamp-work-posing-a-huge-undertaking-for-water-giant/ Shropshire Star, 19 February 2015] (Retrieved 23 May 2022)</ref> When the new pipes were ready to be installed, the contractors discovered there was an unexpected 18-inch gap between two of them, due to the prefabricated nature of the replacement pipes and the fact that the dimensions for the existing buried ones had to be obtained from drawings. This required a linking collar to be fabricated and welded into place. Despite 24-hour working, the track bed was not handed back to the SVR until 3 p.m. on Saturday 14 February, some three days late. This meant the evening's Valentine's Day dining train was unable to use the full length of the line, with a full line service restarting on Tuesday 17 February. The SVR negotiated a suitable financial compensation package for the overrun, in addition to which the car park at Bewdley was resurfaced with tarmac at no cost to the SVR.<ref name=SVR190/> Severn Trent Water also became a corporate partner of [[Severn Valley Railway Charitable Trust Ltd]].<ref name=SStar/> The old pipes remained at the site for several years, but were finally lifted onto wagons by the [[Cowans Sheldon 30-ton steam crane RS 1087|30 Ton Steam Crane]] in April 2018 and moved to Highley. Photos of the move may be seen on the [https://svrbridgnorth.wordpress.com/2018/04/ Bridgnorth Station website]. A short section was retained with the intention of being restored for display in [[The Engine House]].<gallery mode=packed heights=200px style="text-align:left">
File: Pipes_20150528.jpg | Some of the old pipes alongside the railway following replacement
File: Elan_Valley_Pipe_20190506.jpg | Preserved section of pipe at [[Bridgnorth MPD]], May 2019
</gallery>
 
==Film and Television==
The aqueduct briefly appeared in a scene in "Fire on the Line", the third story of the 1980 TV series [[God's Wonderful Railway]].
<gallery mode=packed heights=200px style="text-align:left">
Gods_Wonderful_Railway_Screenshot_7819_Elan_Valley.jpg|7819 passing the Elan Valley Aqueduct
</gallery>
 
==See also==
*[[From The Window]]
*[[Folly Point Siding]]
 
==Notes==
<references group="note"/>
==References==
<references />
==See alsoLinks==*[https://en.wikipedia.org/wiki/Elan_aqueduct Elan Aqueduct on Wikipedia]*[From The Window]http://history.powys.org.uk/history/rhayader/aqueduct1.html Elan Aqueduct on Powys Digital History Project]
<!--{{#coordinates:52.401162401081|-2.331516331720|[primary|][typedim:landmark1000]}}-->[[Category:Featured articles]]
Trustworthy, administrator
11,919
edits

Navigation menu