Changes

Jump to: navigation, search

Arley

No change in size, 23:47, 5 February 2020
m
typo
</gallery>
In 2018 an [[:Category:SVR fundraising lotteries|SVRA raffle]] raised over £7,000 for new facilities including a workshop and storage for Santa equipment to replace a small corrugated metal shed next to the gift shop.<ref>SVR News 200</ref> In late 2019 construction started on the new building at the north end of the station, with the roof coming from part of the old [[Bewdley]] platform canopy. It was also partly funded by the [[Arley Station Fund]]<ref>[https://www.svrlive.com/epfeb20 Express Points, February 2020] (Retrieved 4 February 20102020)]</ref>.
===Restoration===
Trustworthy, administrator
11,886
edits

Navigation menu