November 10: Difference between revisions
Jump to navigation
Jump to search
Content deleted Content added
m add picture |
No edit summary |
||
Line 2: | Line 2: | ||
*[[Severn Valley Railway Timeline 1990-1999#1997|1997]] The P-Way department began relaying the motor points at the north end of Kidderminster loop. Renewal work in [[Kidderminster signal box]] was in progress at the same time.<ref>SVR News 126</ref> |
*[[Severn Valley Railway Timeline 1990-1999#1997|1997]] The P-Way department began relaying the motor points at the north end of Kidderminster loop. Renewal work in [[Kidderminster signal box]] was in progress at the same time.<ref>SVR News 126</ref> |
||
*[[Severn Valley Railway Timeline 2010-2019#2017|2017]] [[6634|GWR 0-6-2T 6634]] left the SVR, departing by road for Peak Rail where owning group [[The Waterman Railway Heritage Trust]] is based. |
*[[Severn Valley Railway Timeline 2010-2019#2017|2017]] [[6634|GWR 0-6-2T 6634]] left the SVR,<ref>[https://forum.svr-online.org.uk/viewtopic.php?t=1217&start=105 SVR-Online Forum]</ref> departing by road for Peak Rail where owning group [[The Waterman Railway Heritage Trust]] is based. |
||
==See also== |
==See also== |
||
Revision as of 13:46, 5 November 2018

On November 10 in SVR history.
- 1997 The P-Way department began relaying the motor points at the north end of Kidderminster loop. Renewal work in Kidderminster signal box was in progress at the same time.[1]
- 2017 GWR 0-6-2T 6634 left the SVR,[2] departing by road for Peak Rail where owning group The Waterman Railway Heritage Trust is based.
See also[edit | edit source]
On this day in SVR history
References[edit | edit source]
- ↑ SVR News 126
- ↑ SVR-Online Forum