November 10: Difference between revisions

From SVR Wiki
Jump to navigation Jump to search
(Created page with "On {{PAGENAME}} in SVR history. *1997 The P-Way department began relaying the motor points at the north end of Kidderminster...")
 
(6634)
Line 2: Line 2:


*[[Severn Valley Railway Timeline 1990-1999#1997|1997]] The P-Way department began relaying the motor points at the north end of Kidderminster loop. Renewal work in [[Kidderminster signal box]] was in progress at the same time.<ref>SVR News 126</ref>
*[[Severn Valley Railway Timeline 1990-1999#1997|1997]] The P-Way department began relaying the motor points at the north end of Kidderminster loop. Renewal work in [[Kidderminster signal box]] was in progress at the same time.<ref>SVR News 126</ref>
*[[Severn Valley Railway Timeline 2010-2019#2017|2017]] [[6634|GWR 0-6-2T 6634]] left the SVR, departing by road for Peak Rail where owning group [[The Waterman Railway Heritage Trust]] is based.
==See also==
==See also==



Revision as of 16:18, 10 November 2017

On November 10 in SVR history.

See also[edit | edit source]

On this day in SVR history

← November 9 - November 11 →

References[edit | edit source]

  1. SVR News 126