Recent changes

Jump to: navigation, search

Track the most recent changes to the wiki on this page.

Recent changes options
Legend:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes
Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Show minor edits | Show bots | Hide anonymous users | Hide registered users | Show my edits

Show new changes starting from 21:26, 7 June 2024
   

7 June 2024

     15:49  Connection to Network Rail‎‎ (3 changes | history) . . (+856). . [Robin‎ (3×)]
      15:49 (cur | prev) . . (+120). . Robin (talk | contribs) (Early preservation history: additional info)
      15:24 (cur | prev) . . (+483). . Robin (talk | contribs) (additional info and history)
      14:57 (cur | prev) . . (+253). . Robin (talk | contribs) (Early preservation history: Ground frame used prior to the Signal Box)
     15:37  Query Corner‎ (diff | hist) . . (+1,021). . Robin (talk | contribs) (Connection to Network Rail: thoughts)

6 June 2024

     20:32  Other rolling stock visiting the SVR‎‎ (2 changes | history) . . (+330). . [Patrick Hearn‎ (2×)]
      20:32 (cur | prev) . . (+139). . Patrick Hearn (talk | contribs)
      20:28 (cur | prev) . . (+191). . Patrick Hearn (talk | contribs) (Add 1999 GTRM "Autoballaster" train)
     20:04  Severn Valley Railway Timeline 1990-1999‎ (diff | hist) . . (+207). . Patrick Hearn (talk | contribs) (1994: Add SVRA railtour)
     20:04  Diesel locomotives at the SVR in preservation‎‎ (2 changes | history) . . (+647). . [Patrick Hearn‎ (2×)]
      20:04 (cur | prev) . . (+391). . Patrick Hearn (talk | contribs) (Added more from Alan Thwaites' images)
      19:08 (cur | prev) . . (+256). . Patrick Hearn (talk | contribs) (2 tours added from Six Bells Junction)
     19:55  Eardington‎ (diff | hist) . . (+235). . Patrick Hearn (talk | contribs) (Added rambler train 1997)
     16:52  Sharp Stewart 0-4-4T Dunrobin‎ (diff | hist) . . (+15). . Patrick Hearn (talk | contribs) (Cab built)
     16:49  BR 3MT 82045‎ (diff | hist) . . (+340). . Patrick Hearn (talk | contribs) (82045 trial boiler fit 6/2024)
     16:47  Severn Valley Railway Timeline 2020-2029‎ (diff | hist) . . (+443). . Patrick Hearn (talk | contribs) (82045 trial boiler fit 6/2024)

4 June 2024

     15:28  Severn Valley Railway Timeline 2020-2029‎ (diff | hist) . . (+6). . Robin (talk | contribs) (Steam locomotives used: Mileages from SVR(H) accounts)
     15:23  2020 coronavirus disease (COVID-19) pandemic‎ (diff | hist) . . (+256). . Robin (talk | contribs) (Effects on the SVR: New CBILS loan terms)