Changes

Jump to: navigation, search

Absolute Block

10 bytes added, 09:39, 25 January 2015
Clarified which lines AB applies to
A method of signalling for controlling the passage of trains over a double track railway. The only section of the current SVR controlled this way is that the main lines between [[Bewdley North signal box|Bewdley North]] and [[Bewdley South signal box|Bewdley South]] signal boxes.
Trustworthy, administrator
300
edits

Navigation menu