Victoria Bridge

3 bytes removed, 07:18, 7 June 2016
m
typos
Although the deck of Victoria Bridge was built to single track width, the abutments were built wide enough for [[double track]], meaning the bridge could have relatively easily been converted to double track.
The original [[The Severn Valley Railway under GWR/BR ownership#Before construction: 1845-1858 | 1852 estimate]] for the construction of the Railway, which included £8,500 for "a girder bridge at Arley"<ref>[http://www.gutenberg.org/files/17612/17612-h/17612-h.htm Handbook to the Severn Valley Railway, by J. Randall 1863]</ref>, also showed the station at Bridgnorth sited in the Low Town, east of the river. Although more convenient for the public, this would have required two further bridges, one south of the town near Quatford costing £8,000 and another north of the town near the present day golf course costing £9,000. A fourth bridge costing £10,000 was included near Shrewsbury in order to reach a junction with the Shrewsbury and Chester Railway. Cost saving measures adopted in the final railway plans resulted in the line remaining on the west bank and passing under High Town through [[Bridgnorth Tunnel]] instead, and joining the Shrewsbury & Hereford Railway instead, removing the need for these additional bridges.<ref Name = "Nabarro" />
==Victoria Bridge in preservation==
Trustworthy, administrator
11,873
edits

Navigation menu