Changes

Jump to: navigation, search

Bewdley Tunnel

123 bytes added, 18:11, 6 June 2015
m
add links
The track through the tunnel was replaced as part of a major refurbishment during the winter of 2011-12. In order to simplify future maintenance the existing jointed track was replaced by continuously welded rail (CWR), resulting in the absence of the traditional 'clickety-click' from the wheels as the train passes through the tunnel.
 
==See also==
[[List of infrastructure]]
==Sources==
[http://www.bewdleystation.co.uk/History4.html Bewdley station web site]
 
==See also==
[[Stourport Road Bridge | Towards Kidderminster]]<br>
[[List of infrastructure]]<br>
[[Devil's Spittleful (Rifle Range) Bridge | Towards Bridgnorth]]
Trustworthy, administrator
11,876
edits

Navigation menu