Alveley Sidings

89 bytes removed, 29 February
m
Reference to temporary speed restriction removed
In 1996, [[Country Park Halt]] was opened on the site. The river bridge linking the main country park on the east bank with the Halt on the SVR was replaced in 2006.<ref>[https://www.transportxtra.com/publications/local-transport-today/news/7072/highley-alveley-footbridge-shropshire News article on www.transportxtra.com]</ref> It is also used by [[National Cycle Route 45]].
Following [[Severn Valley Railway Timeline 2020-2029#2020|extensive flooding in February 2020]] land movements were observed in Alveley Woods. {{As of|2020|08}} a 5 mph temporary speed restriction is in force in the affected area. Electronic ‘tilt monitoring’ equipment was fitted in February 2021<ref>[https://www.svrlive.com/blmar21 Branch Lines, March 2021] (Retrieved 7 March 2021)</ref>.
In March 2021 contractors installed a small drainage system adjacent to the landslip to assist with removal of rainwater, to reduce the amount of water reaching the slip plane and take a degree of pressure off the embankment.
Trustworthy, administrator
6,661
edits

Navigation menu