Changes

Jump to: navigation, search

SVR timetables

972 bytes added, 11:54, 29 January 2023
reformatted and text added
{{Stub}}
This page includes images of published SVR timetables since opening in 1970
 
==1970 - 1973: Bridgnorth to Hampton Loade==
==Gallery==
<gallery>
File:1970 timetable001.jpg | 1970
File:1973 timetable001.jpg | 1973
File:1973 timetable002.jpg | 1973
</gallery>
 
==1974 – 1984: Bridgnorth to Bewdley==
The line opened as far as [[Highley]] in April 1974 while work was completed on replacing the [[Underbridge on Station Road, Highley|underbridge south of the station]]. The full line to Bewdley opened in May 1974, although crossing at [[Arley]] was not possible until the Up loop (the line nearest the station) was [[Arley#Restoration| recommissioned in 1975]].
 
<gallery>
File:1974 timetable005.jpg | 1974 (Highley)
File:1974 timetable006.jpg | 1974 (Highley)
File:1974 timetable001.jpg | 1974
File:1974 timetable002.jpg | 1974
File:1974 timetable003.jpg | 1974
File:1974 timetable004.jpg | 1974
File:1974 timetable005.jpg | 1974
File:1974 timetable006.jpg | 1974
File:1975 timetable001.jpg | 1975
File:1975 timetable002.jpg | 1975
File:1984 timetable002.jpg | 1984
File:1984 timetable003.jpg | 1984
</gallery>
 
==1984 onwards: Bridgnorth to Kidderminster==
A second version of the 1984 timetable was published with the opening of the full line to Kidderminster on 31 July 1984.
 
In 2007 the line was closed by the [[2007 Storm Damage|storm damage]] in June. A limited service operated at the start of 2008 with full line services resuming at Easter, coinciding with the opening of [[The Engine House]].
 
<gallery>
File:1984 timetable005a.jpg | 1984
File:1984 timetable006.jpg | 1984
File:2017 timetable 002.jpg | 2017
</gallery>
 
==See also==
Trustworthy, administrator
11,918
edits

Navigation menu