*At March 2017 the survey had been used to prepare outline plans, discuss them with the SVR management and other key parties, and obtain approximate prices for creating such a facility.
*In winter 2019-20 the opportunity was taken to install a set of points at [[Foley Park]] for future use with a siding or shed. The points are controlled by a [[Ground Frames at Foley Park|ground frame]] which was previously installed at Kidderminster. Electrical work to allow a release during traffic hours was not pursued at the time.<ref name=blmay21/>
 
[[File:Foley_Park_Points_20200912.jpg|thumb|300px|right|The new point being installed at Foley Park 12 September 2020]]
The clearance work so far has not uncovered any track drainage suggesting that the design should incorporate a new drain and/or French drains to discharge at the east end where St Francis Group have their outfall to the canal/river.
Trustworthy, administrator
6,720
edits

Navigation menu