Changes

Jump to: navigation, search

Kidderminster Footbridge

2 bytes removed, 07:02, 9 March 2022
Extension and replacement
Long-mooted plans by Network Rail to replace the footbridge received financial approval in 2021, with works programmed from December until May 2022. The proposed design will be a single-span constructed in ‘weathering steel’ with new abutments at each end. All traces of the existing bridge will disappear including the central brick pier.<ref name=blsep21>[https://www.svrlive.com/blsep21 Branch Lines, September 2021]</ref> The SVR's aspiration to extend the bridge to give access from the station to the [[Kidderminster Turntable | turntable]] will remain an aspiration, due to a lack of funds.
The old bridge spans were lifted out and demolishion demolition of the central pier were completed in the morning of Sunday 13 February 2022. Demolishion Demolition of the west abutment was completed on Monday 14th February 2022 with the footpath embankment being dug away to allow for the excavation of the pier base.
==References==
Trustworthy
5
edits

Navigation menu