*1912-1915: Approval was given for construction of a footbridge, which was a steel lattice-girder structure of two spans. The bridge was reluctantly deemed beyond economic repair and demolished by the SVR in 1974. It was situated in the same location as the current footbridge which dates from 2009.
*1921: The population of Highley had reached 1,985, with at least 500 employed at the colliery. Over the following years passenger numbers remained high while beginning to fall elsewhere on the line; during the 1930s Highley averaged 20,000 ticket sales per year which exceeded both Stourport and Bridgnorth.
*1922: [[SVR staff in 1922#Severn Valley Railway (Kidderminster to Bridgnorth)|GWR staff records for 1922]] show the station had a staff of 12, including those working at [[Kinlet and Billingsley Sidings signal box|Kinlet Sidings]].
*1963: Through passenger services ceased on 9 September, with through freight services ending at the end of November.